Project Timeline
April → October 2022
Phase 1
Note: The 1st area of construction will start at Reid Street to just past Hendren’s Funeral Home. This area will be completed 1st and a licenced archeologist will be overseeing the excavation of this section of construction due to the presence of the pioneer cemetery.
Water Street (from Concession Street to just before Reid Street):
- New watermain
- Storm water
- New roadway (1st lift) and curb and gutter
- Layby parking beside St. Paul’s Church
- Defined parking beside boat launch
- New sidewalk in front of condos to King Street and replacing existing sidewalk
- Boat launch improvements (upland apron and in-water)
- Note: pending permit approval, in-water boat launch works to take place commencing late fall of 2022 and be completed by spring of 2023.
King Street:
- New water and sanitary main
- Storm water
- New roadway (1st lift) and curb and gutter
- Replacement of existing sidewalk
April → November 2023
Phase 2
Water Street (from Reid Street to Bridge Street):
- New watermain
- Storm water
- New roadway (1st lift) and curb and gutter
- Designated parking at bridge
- Replacement of existing sidewalk
Reid Street:
- New water main from Charlotte to Water Street
- Some minimal sanitary work
- New roadway and sidewalk re-install